top of page
IMG_8469.jpg

Our Manufacturing Services

Our Process

From Concept to Production,
With Clarity at Every Step.

Clear steps. Clear timelines. No guesswork.

From approved sample to shipment-ready goods, we keep you informed at every stage, with a typical production cycle of 30–45 business days.

Thien Huy - Design Submission for Garment Manufacturing

Step 1: Ideation & Feasibility Assessment

We review your tech pack, sketches, size chart, or reference samples to assess technical feasibility, optimize construction, and evaluate manufacturing risks before moving forward.

Deliverables/Checklist:

Tech Pack & Reference Review

Material & Fit Compatibilit

Cost Optimization Advice

Deliverables/Checklist:

Tech Pack & Reference Review

Material & Fit Compatibilit

Cost Optimization Advice

Step 2: Transparent Costing 
& Material Sourcing

Thien Huy - Technical Assessment for clothes made in Vietnam

Receive a 100% itemized quotation (no hidden fees) alongside fabric, trim, and packaging options curated specifically for your target cost and quality tier.

  • Itemized Cost Breakdown (Fabric, CMT, Trims)

  • Swatch & Trim Recommendations

  • MOQ Guidance & Lead Time Timeline

Technical Assessment

Thien Huy - Technical Assessment for clothes made in Vietnam

Our team reviews garment construction, stitching methods, measurements, and material compatibility before sample development begins. This stage helps identify potential production challenges early while improving production readiness, workflow planning, and manufacturing feasibility before execution moves forward.

Thien Huy - Quotation for OEM garment manufacturing in Vietnam

Step 3: Sampling & Precision Refinement

We create your physical prototype and refine every detail-fit, construction, branding labels, artwork prints, and functionality-until you achieve the perfect sample.

Deliverables/Checklist:

Physical Prototype Development

Fit, Measurements & Stitching Review

Revisions until Full Approval

Thien Huy - Quotation for OEM garment manufacturing in Vietnam

Preliminary Cost Quotation 

Based on product specifications, materials, construction complexity, and estimated order quantity, preliminary quotations are prepared within 24–48 hours. Early costing helps brands evaluate production feasibility, improve budget visibility, and make faster development decisions before moving into sampling.

Step 4: Bulk Production & In-Line QC

z7973925387473_c939e41bc525b9c84f3182bd58f5d582.jpg

Production officially launches only after your signed sample sign-off. We maintain transparent photo/video updates and conduct strict in-line quality control at every milestone

Fabric Sourcing & Inspection

Precision Cutting & Sewing

Milestone Progress Updates

91aac5d54711d463482ca97202b8c12a.jpg
Thien Huy Sampling for clothes and garments

Step 5: Final Inspection & Global Delivery

Every shipment undergoes rigorous AQL 1.5 inspection, measurement verification, and barcode-ready export packaging. Shipped via FOB, CIF, or Door-to-Door DDP terms.

AQL 1.5 Standard Inspection

Custom Barcode & Carton Packaging

Full Export Documentation & Flexible Shipping

(FOB / CIF / DDP)

Refining Every Detail

Thien Huy Fitting for garment and clothing made in Vietnam

We work closely with your team to perfect fit, construction, branding, and functionality.

Fit & Measurements

Construction Details

Artwork Placement

Branding Elements

Packaging Details

Product Functionality

Refining Fit & Construction

Thien Huy Fitting for garment and clothing made in Vietnam

If revisions are required, our development team works closely with customers to adjust fit, measurements, construction details, and finishing methods before final approval. Most revisions are completed within 5–7 working days depending on adjustment complexity. This process improves fit consistency, product functionality, and production stability while helping ensure smoother execution during manufacturing.

Bulk Production and Approval for order in Vietnam of garment

Preparing for Bulk Production

Final approvals ensure all production requirements are aligned before manufacturing begins.

Approved Sample

Fabric Approval

Labels & Packaging

Quality Standards

Delivery Schedule

Production Specifications

Manufacturing
with Confidence

Thien Huy Printing technology for clothes made in Vietnam

Once everything is approved, your project moves into production under dedicated supervision. Throughout the process, we maintain transparent communication, conduct quality control at every stage, and ensure every detail remains consistent with the approved sample and product specifications before shipment.

91aac5d54711d463482ca97202b8c12a.jpg

Quality Assurance & Delivery

Final approvals ensure all production requirements are aligned before manufacturing begins.

Quality Assurance & Delivery

Final approvals ensure all production requirements are aligned before manufacturing begins.

AQL Inspection

Packaging Review

Measurement Verification

Carton Verification

Export Documentation

Workmanship Inspection

Production Planning & Execution

Thien Huy Printing technology for clothes made in Vietnam

Following final approval, production scheduling and execution are coordinated based on order volume, material readiness, and delivery timelines. Standard production lead times typically range between 30–60 days depending on product complexity and manufacturing requirements. Structured coordination across sourcing, cutting, sewing, finishing, and packing operations supports smoother execution and more reliable delivery performance throughout the production cycle.

Take the First Step: Request a Development Sample

Experience our clear communication, fabric sourcing speed, and stitching precision firsthand before committing to full production runs.

bottom of page